On June 30th, five squid fishing vessels of Rongyuan Company arrived at the central fishing port of Shaowu Island with full loads of fish from the Atlantic fishing ground. After completing the procedures such as customs declaration and inspection and testing, they immediately entered into the intense process of unloading.
After unloading, the five fishing vessels will promptly commence various pre-departure preparations such as dry-docking, ship inspection, and material replenishment. They are scheduled to set sail for operations in early September.

Unloading site
Copyright © JINGHAI GROUP CO..LTD Record number: Lu ICP No. 20026525 Lu public network security:No. 37108202000449 Website construction: Henghui Technology disclaimer